Menu +

Industry

AI and Custom Software for Construction

Construction companies lose margin in the gaps: slow estimates, missing site information, and paperwork that arrives days late. AI Easy Mode builds estimating support, project tracking, site reporting and document handling tools that connect the office to the field without forcing crews onto complicated software.

The office and the site are on different systems

Daily reports arrive as photos in a group chat, variations get agreed verbally, and the estimator rebuilds the same pricing sheet for every tender.

  • Slow tender turnaround
  • Variations captured late or not at all
  • Project status unclear until someone visits

Field-simple, office-complete

Simple mobile capture for crews, structured records for the office, and AI doing the reading and summarising in between — from drawings to daily reports.

  • Photo and voice capture from site
  • Automatic daily and weekly summaries
  • Variations logged the moment they happen

Who this is for

  • General contractors
  • Subcontractors and specialist trades
  • Project and commercial managers

What we actually build

Estimating support

Quantities and line items drafted from drawings and scopes against your rate card.

Site reporting

Crews submit photos and a voice note; the system writes the structured daily report.

Document and RFI control

Drawings, RFIs and approvals tracked with the current version always obvious.

How we do it

  1. 01

    Walk the process

    Office and site, because the handover between them is usually the problem.

  2. 02

    Start where margin leaks

    Estimating speed or variation capture, most often.

  3. 03

    Build for gloves and daylight

    Field tools that work on a phone, offline, quickly.

  4. 04

    Roll out per project

    Prove it on one job before rolling it across the business.

Typical integrations

  • Accounting and payroll
  • Project scheduling tools
  • Cloud drives and drawing storage
  • Email
  • Timesheet systems

Why it's worth doing

Faster tenders

More bids out the door with the same estimating team.

Protected variations

Extra work captured and billed instead of absorbed.

Current project picture

Progress visible without a site visit or a phone call.

§ FAQ

Questions people ask before starting

Will crews actually use it?
Only if it is faster than the group chat they use now. That is the design constraint we build to: a photo, a tap and a voice note, nothing more.
Do you replace our project management software?
Usually not. We fill the gaps around it, because most firms already have a scheduling tool they are not going to change.
Can it read our drawings?
Often, for quantities and scope text. We test on your actual document set before quoting.

Tell us the problem. We'll tell you if we can help.

A free 30-minute call, a written scope, and a fixed number before anything gets built. If software isn't the answer, we'll say that too.

Show us the bottleneck